Skip to content
  • Projecten
  • Services
  • About us
  • Contact
  • Projecten
  • Services
  • About us
  • Contact
Support

Clean design promotes easy navigation.

IMG_0982

Controlled Release of the Embedded Steel Ring

The steel ring is the most critical structural element within a wind turbine foundation. It is designed to anchor extreme loads and is deeply integrated into reinforced concrete.

Releasing this component requires precision, not force.

At Weever Sloop, we apply specialist techniques to separate the steel ring from the surrounding concrete without compromising its structural integrity.

Our Focus

  • Controlled separation from reinforcement

  • Avoidance of distortion or micro-cracking

  • Protection of connection points

  • Careful lifting preparation

This phase determines whether the component remains technically reusable.

The Result

A structurally intact steel ring ready for inspection, transport, and potential reuse in turbine relocation.

Info@Weever.nl

Specialist in Wind Turbine Foundation Demolition, with Preservation of the Steel Ring

Our Pages
  • Homepage
  • About Us
  • Projects
  • Our Services
  • Contact
Get in Touch

8264CG Genuakade 4a
Kampen NL

Info@weever.com
0383332010

Our Newsletter
  • Facebook
  • Linkedin
  • Youtube

Weever — 2026 All Right Reserved